In modest progress, I’ve started to convert the pile of recycled layout wood into more real estate for Dales Peak. This set of MDF parts has produced the frame for the final ‘Overdale Quar… more →
Dales Peakwrote 1 week ago: In modest progress, I’ve started to convert the pile of recycled layout wood into more real es … more →
wrote 1 month ago: Following on from my last post I’ve dummied up a section of conveyor to decide the how to posi … more →
wrote 1 month ago: I need to leave a hole in the load out building to take the conveyor from the final screening buildi … more →
wrote 1 month ago: Just as a way of focusing my attention on the things that I need to do in the not too distant future … more →
wrote 1 month ago: Working on the top half of the ‘Overdale Quarry’ load out building Not got much done sin … more →
wrote 2 months ago: It’s been that cold in the loft recently that I’ve not been inclined to go up there, eve … more →
wrote 2 months ago: With the track plan for the corner worked out, I printed out the sections as tiles and quickly laid … more →
wrote 2 months ago: The last Mk5 track plan I put up was definitely over ambitious. Such ideas of grandeur were probably … more →
wrote 2 months ago: Overdale Quarry – with the ‘Phase 2′ module installed and topped out This module gives m … more →
wrote 2 months ago: Lenz LI-USB Computer Interface Another quick job done whilst I was in the loft was to reconnect the … more →
wrote 2 months ago: With the module frame for ‘Phase 2 of ‘Overdale Quarry’ assembled the next stage was to install it. … more →
wrote 2 months ago: Cross members for the Phase 2 module Having cut the first two elements of the module for ‘Phas … more →
wrote 2 months ago: Following on from my last post ‘This week on Panorama…’ I’ve now cleared some spac … more →
wrote 3 months ago: Loft panorama before starting ‘Phase 2′ Before I can begin ‘Phase 2′ of Dale … more →
wrote 3 months ago: MDF might be extremely versatile but the dust it makes, in a confined space like the loft, is too mu … more →
wrote 3 months ago: After a quite January on the railway modelling front I’ve decided that it is about time for so … more →
wrote 4 months ago: Before I can finish the ‘Overdale Quarry’ rail load out building, I need to work out whe … more →
wrote 5 months ago: I downloaded a brochure for the Caterpillar 777D a little while ago, with a view to possibly scratch … more →
wrote 6 months ago: As I get towards the end of the track ballasting I’m starting to consider the next stage of th … more →