In the Drawing Room Last week, Susan Buck, Architectural Finishes Conservator, visited Montpelier to continue work on two ongoing projects in the drawing room (M108): the search for curtain hanging ev… more →
Montpelier Curatorial Blogmontpelierrestoration wrote 3 months ago: In the Drawing Room Last week, Susan Buck, Architectural Finishes Conservator, visited Montpelier to … more →
montpelierrestoration wrote 7 months ago: The restoration crew has started to hang shutters on the exterior of the house. Rear of the house, f … more →
montpelierrestoration wrote 11 months ago: Doors Mac Ward is installing the door jambs in the cellar. Gene Lyman continues to install door hing … more →
montpelierrestoration wrote 1 year ago: Doors Mac Ward continues to hang doors on the second floor. In the photos above he is trimming the … more →
montpelierrestoration wrote 1 year ago: Doors Mac Ward continues to hang doors on the second floor. Keith Forry is finishing the repairs to … more →
montpelierrestoration wrote 1 year ago: Doors Mac Ward continues to install weather stripping on the door frames. Keith Forry has finished i … more →
montpelierrestoration wrote 1 year ago: Doors Mac Ward is installing weather stripping around the door stops. We are using a non-invasive we … more →
montpelierrestoration wrote 1 year ago: Doors Mac Ward continues to install door sweeps and is currently working on the second floor, exteri … more →
montpelierrestoration wrote 1 year ago: Doors Mac Ward is installing door sweeps on all the exterior doors. The rubber sweeps are mounted t … more →
montpelierrestoration wrote 1 year ago: Painting The painters have finished putting the final coat of solid body acrylic stain on the front … more →
montpelierrestoration wrote 1 year ago: Painting The painters have returned to Montpelier to put the final coat of solid body acrylic stain … more →
montpelierrestoration wrote 1 year ago: More Photos From the Restored Montpelier West Elevation with Fence (still needs shutters and a gate) … more →
montpelierrestoration wrote 1 year ago: Plastering The masons have installed the finished brown coat on a majority of the walls in M-108 (Dr … more →
montpelierrestoration wrote 2 years ago: HVAC/MEP Six of the twelve geo-thermal wells have been drilled and the security wiring is being inst … more →
montpelierrestoration wrote 2 years ago: RAC Update – 6/12/2007 HVAC/MEP The fresh air intake, which will be hidden by the north wings ea … more →
montpelierrestoration wrote 2 years ago: RAC Update – 6/6/2007 HVAC/MEP MEP work continues in the bunker and work has begun on the perimeter … more →
montpelierrestoration wrote 2 years ago: RAC Update – 5/29/2007 HVAC/MEP MEP work continues in the bunker. The floors in the two wing kitch … more →
montpelierrestoration wrote 2 years ago: RAC Update – 5/23/2007 HVAC/MEP MEP installation continues and final planning for drilling the g … more →
montpelierrestoration wrote 2 years ago: RAC Update – 5/15/2007 HVAC/MEP Connections between the cellar, event panels and the bunker continue … more →