Tags » Tbm

SLVE, A Landing Strip for Explorers

On a remote airstrip where the runway has more grass than dirt, SOCL has been working with a local expedition and safari company. Far away from prying eyes and in a part of the world sometimes referred to as “the place sheep go for vacation,” SOCL has been quietly charting land and looking for something. 162 more words

Business Section

IT Transparency Leads to IT Value and Increased Influence for CIOs

Note: I wrote this article for the November 10, 2015 issue of CIOReview.

Stop talking about technology, corporate leaders aren’t listening. As CIO the expectation is, of course, that you are going to provide a superior technology portfolio, that you are going to track critical operational metrics, and that you are going to maximize uptime and deliverability. 855 more words


Double Gate Installation

TaylorBrooks manufactured and installed this set of double gates, side entrance and railings  as part of ongoing renovations for a customer in Battle, East Sussex.


15 old buildings in Balepet develop cracks during tunnelling work

In Balepet, 15 buildings have turned out to be a bottleneck for the Metro tunnel-boring machine Kaveri after it damaged the buildings. The contractor of the Metro work has already issued notices to the occupants to evacuate the buildings. 287 more words


Brighton Renovations

‘We are really pleased with our gate and railings, they look fantastic and we’ve received many compliments from friends, family and neighbours. TBM made sure we were happy with every detail of the design before work commenced. 14 more words


Berlin Line U5 tunnelling complete

TUNNELLING has been completed on the project to connect Line U5 with Line U55 on the Berlin U-Bahn by constructing a 2.2km underground link from Alexanderplatz to Brandenburg Gate beneath the historic heart of the German capital. 160 more words